Services

Façade Installation Services

Commercial façade package installation with clear responsibility boundaries and live-site awareness.

Service Scope

Clear first. Detail where it matters. Defined installation scopes with approved project information and no design-responsibility overclaim.

Completed rainscreen facade panel installation on a multi-storey UK building.

Rainscreen & Cladding Installation

Panel installation, framing interfaces, trims and alignment checks from approved drawings.

View service detail →
Northern Angel residential recladding and façade remediation environment in Manchester.

Recladding & Façade Remediation

Phased removal and replacement where access, sequencing and QA evidence need control.

View service detail →
Fire barrier and cavity barrier interface detail during facade remediation works.

Fire Barriers & Cavity Barriers

Installed in line with approved drawings, fire strategy and manufacturer requirements.

View service detail →
Flashings, cappings and window surrounds on a Swindon facade project.

Flashings, Cappings & Window Surrounds

Openings, parapets, cills, trims, closures and weathering details.

View service detail →
Commercial glazed facade works with MEWP access on an active construction site.

Curtain Wall Interface & Remedials

Adjacent façade interface works, trims and closing details around glazing packages.

View service detail →
Tata Steel metal cladding and flashing works on a BS1 student accommodation rooftop.

Metal Cladding & Roofing Installation

Commercial metal envelope, roofline interfaces, flashings and weathering details.

View service detail →
Kingspan panel installation at ScienceCreates OMX, Bristol.

Insulated Panel & Kingspan Panel Installation

Architectural insulated panel installation, flashings, gutters and interface details from approved project information.

View service detail →
Heavy GRC panel installation at One Friary, Temple Quay, Bristol.

GRC Systems

GRC panel installation where lifting, fixing points, setting-out and tolerances need control.

View service detail →
Cardiff brick slip facade system with louvres and interface detailing.

Brick Slip Systems

Brick slip façade installation, coursing, openings and interface details from approved layouts.

View service detail →
Insulated render and wet facade system on a commercial building.

Insulated Render / Wet Façade Systems

Wet façade environments with substrate, sequencing and finish control.

View service detail →

Site-Led Cladding Support

Cladding packages do not usually become difficult because of fixing alone. Issues appear where drawings, project-supplied materials, access, sequencing and real site conditions do not align.

We bring practical cladding judgement into those moments. The useful question is often simple: what is clear enough to install, what needs clarification and what must be agreed before labour is committed to site?

Once the scope is clear, we deliver the approved defined installation package: rainscreen cladding, recladding, flashings, trims, cavity / fire barrier interfaces and completion works.

Responsibility boundaries stay clear.

We are not a design consultant, fire engineer, material supplier or principal contractor. We install defined façade packages within agreed responsibility boundaries, approved project information and site instructions.

Defined cladding installation packages for real site conditions.

Occupied-Building & Remediation Support

Defined installation package support for housing association, occupied-building and council-linked project environments.

Where access, phasing and public interface are already being managed by the project team, Cladders.co.uk can support recladding, remediation, fire / cavity barrier interfaces, flashings and façade package works.

Typical Package Evidence

Useful evidence for PMs, QSs and site teams when façade packages need clean close-out.

Photo recordsInstallation stages, interface conditions and completion progress recorded where required by the package.
Drawing / revision trailWorks referenced against approved drawings, revisions and marked-up package information.
Access / sequencing notesScaffold, MEWP, exclusion zones and elevation release recorded when they affect programme.
Snag and close-out supportClear issue notes and completion evidence to help the project team close the package.

Pre-Qualification Readiness

Quiet reassurance for tender, pre-start and package review conversations.

Package scale reviewScope, access, programme and team structure are reviewed before commitment.
Competency coverageGold / Blue CSCS, SSSTS, IPAF and PASMA coverage available within the team where relevant.
Documentation routeRAMS, ITP awareness and QA records can be aligned to the agreed package requirements.
Insured contractor statusPublic Liability and Employers’ Liability insurance in place. Certificates available on request.

Send Drawings for Scope Review

Start with a quick note, or use the full project pack route when drawings are ready.