Fire & cavity barriers / Installation
Install to approved details. Agree inspections before covering.

The installation scope
Confirm locations, interfaces and inspection stages.
Site queries
Refer conflicts to the project team. Photos and checklists do not replace approved details.
Installation records
Fields to agree with the project team.
This is a recording guide, not a completed inspection.
Elevation, level and grid or agreed area reference.
Current drawing revision, specification and relevant manufacturer information.
An overview and the close-ups required at the agreed inspection stage.
Query, responsible contact, response and inspection status.
Product selection, orientation, fixing and acceptance requirements follow the approved fire strategy, drawings, specification and relevant manufacturer instructions. Design and approval remain with the appointed project team.