Installation experience
Participation in selected brick-slip installation in Cardiff and London. The archive shows support preparation, installation, corners and opening details.
Before starting
- Confirm the issued layout, datum and joint arrangement.
- Check the specified support and substrate requirements.
- Resolve window, corner and termination details with the project team.
- Confirm access and inspection stages.
Record the details
Photograph support preparation and junctions before they are covered. Link records to the work area and drawing reference.
Follow the project specification and manufacturer information. Photographs do not establish a system specification or approval.
