How we work

Install.
Record.

Confirm scope. Resolve queries. Record by location.

How we work

Confirm. Install.
Record.

Confirm the scope. Resolve queries before covering.

  1. 01

    Confirm scope

    Check work areas, current drawings and interfaces.

  2. 02

    Resolve queries

    Refer missing or conflicting details to the project team.

  3. 03

    Install

    Work to approved project information and relevant manufacturer instructions.

  4. 04

    Record

    Link photos, notes and actions to the work area.

Raise a query

  1. Identify the work area and the question.
  2. Refer it to the appointed project team.
  3. Keep the response with the installation record.

Records support review. Recording an installation does not mean it has been accepted.

Cladders OS

Our own app

From site.
To report.

Photos, work notes, quantities and QA. A step-by-step record of our installation work, from a phone.

Capture → Record → Filter → Review → Export

Procore, BIM and custom exchange

We can scope custom imports, exports and PDF layouts for your team's Procore or BIM workflow. Two-way exchange needs platform access, agreed field mappings and a tested connector.

Discuss your project
56 seconds · Real site photographs, sample entries and a live QA screen excerpt. Custom connections require project setup.
Read the steps
  1. Select the area and photograph the work before, during and at completion.
  2. Record the quantity and work date. Name the installer in the note and link the photo.
  3. Filter by area and period to find the supporting evidence.
  4. Follow the photo history and work notes. The record author and the installer may be different people.
  5. Complete the relevant checks and collect evidence. QA release remains with the appointed reviewer.
  6. Export PDF reports. Inspection exports also offer ZIP, CSV and XLSX.

The film uses sample records around anonymous current-work photos. It does not show a completed QA release or a live two-way Procore/BIM connection. History reflects the records entered.

Project records

Records by
location

Agree the required records before starting. Organise photographs and notes by location and inspection stage.

Sample template only. Not a completed inspection record.

Open sample record

Illustrative record template

Façade installation record

Location
Elevation / grid / level
Reference
Drawing revision / inspection point
Evidence
Overview + close-up photographs
Observation
Installed condition / query raised
Close-out
Responsible contact / action / status

Project requirements.

Records support project review. Approved designs and manufacturer instructions remain controlling.